Minerals Handling & Logistics

Moving bulk freight
by rail.

GoRail Freight Limited is a Zambian minerals handling and logistics provider. We own and operate the locomotives, wagons and sidings that carry bulk freight from source to customer across the Zambia Railways network.

Senkobo — Batoka — Chandwe Musonda — Bwana Mkubwa
≈ 763 km of corridorRail Freight & Logistics
Who We Are

A minerals handling and logistics provider. Plainly.

GoRail moves bulk minerals and general freight on the Zambia Railways network. We are not a broker and we do not hand the load to someone else — the locomotives, the wagons, the sidings and the people are ours.

Everything we do is set up to suit the customer's needs: the tonnage, the schedule, the specification, the delivery point. That is the whole job, and we do all of it.

Owner-operated
We own what we run — locomotives, wagons, sidings and the teams that work them.
Source to customer
One operator carries the freight from the loading point to the customer's gate.
Built to the load
Schedules, wagons and handling arranged around each customer's tonnage and spec.
Growing rail freight
Putting more of Zambia's bulk freight back on rail, corridor by corridor.
GoRail in motion — from siding to corridor
One Line, The Whole Chain

From the mine to the market — under one operator.

Most freight changes hands three times before it reaches the customer. Ours doesn't. The same company that loads it at the mine puts it on rail and hands it over at the gate.

  1. 1
    The Source

    At the mine

    Freight loaded at origin sidings with quality tested at source — the spec is confirmed before a wagon moves.

  2. 2
    The Rail

    On our line

    Our own locomotives and wagons haul the consignment across the ZRL corridor — one operator, end to end.

  3. 3
    The Customer

    At the gate

    Offloaded, weighed and documented at destination. Delivered to the customer's requirement, not to a middleman.

Capability

This is what we put on the line.

Locomotives, wagons, loading machinery, workshops and the people who run them — the working weight behind every consignment GoRail moves in Zambia.

Excavator on the loading gantry filling wagons, shunter alongside
Coal in the bucket — loading a wagon from above
Elevated loading rig working the stockpile
16
Mainline locomotives in the fleet programme
4
Owned and operated sidings on the corridor
ZRL
Full network coverage, Southern Province to Copperbelt
In-house
Workshop, engineering and operations teams
On the corridor

Tonnage in motion, every day of the week.

Loaded consists working the ZRL mainline between Senkobo, Batoka, Chandwe Musonda and Bwana Mkubwa.

The Fleet

Sixteen mainline locomotives.

A fleet of JNR DE10 mainline locomotives, shipped from Japan, collected at the port by our own team and rebuilt in our own workshop — port to corridor, bogie to cab.

The fleet · lined for the corridor
The fleet · lined for the corridor
DE10s staged in the yard
DE10s staged in the yard
DE10s in transit
DE10s in transit
DE10 1752 · in the line
DE10 1752 · in the line
Our Network

Four sidings. One rail corridor.

Operational nodes along the Zambia Railways line — from Southern Province loading through our Lusaka workshop hub to Copperbelt offloading.

  1. Southern Province
    Senkobo
    Zimbabwe clearance siding
    Our border-clearance point near Livingstone — cross-border freight from Zimbabwe is cleared here before joining the corridor north.
    ≈ 239 km
  2. Southern Province
    Batoka
    Coal loading siding
    Primary coal loading point. Southern Province coal is received, stockpiled and loaded onto rail here.
    226 km
  3. Lusaka
    Chandwe Musonda / NKM
    Workshop & assembly hub
    The engineering heart of the fleet — locomotive rebuild, maintenance and train marshalling on the Lusaka node.
    297 km
  4. Copperbelt
    Bwana Mkubwa, Ndola
    Coal offloading
    Copperbelt destination siding — wagons are offloaded, weighed and documented for delivery to the customer.
Corridor Distances
≈ 239 km
Senkobo → Batoka
226 km
Batoka → Lusaka (NKM)
297 km
Lusaka → Bwana Mkubwa
≈ 763 km
Full corridor, south to north
Distances per the Zambia Railways distance chart, measured between the nearest mainline stations on the Livingstone–Ndola corridor.
Regional Network

Zambia at the centre of it.

Our corridor runs Senkobo to Bwana Mkubwa. From it we connect south into Zimbabwe, north into the DRC and east to the Indian Ocean on TAZARA. Tap any point on the map.

Click the map to enable scroll zoom. Pinch to zoom on touch devices.

Our corridorConnecting networks GoRail siding Interchange
On the Ground

The work, as it happens.

Zambia · Rail Corridor
Night operations
Night operations
Our people
Our people
On the move
On the move
The machines
The machines
Clients & Partners

Trusted by operators across the corridor.

Smart Logistics logo
Reload Logistics logo
Handyman's Lime logo
Sinoma International logo

Put your freight on the line.

Talk to our operations team about capacity, sidings and scheduling on the ZRL network.